MRT disruption: Restoration of power rails 'fully completed', safety tests set for Sunday

MRT News

MRT disruption: Restoration of power rails 'fully completed', safety tests set for Sunday
Train DisruptionSMRT
  • 📰 ChannelNewsAsia
  • ⏱ Reading Time:
  • 31 sec. here
  • 4 min. at publisher
  • 📊 Quality Score:
  • News: 23%
  • Publisher: 66%

"As of Saturday (Sep 28), we have successfully recovered and completed functionality tests on three track point machines and associated trackside equipment," said SMRT.

"As of Saturday , we have successfully recovered and completed functionality tests on three track point machines and associated trackside equipment," said S MRT .

More than 300 engineers and technicians have been working to repair the damage to tracks and equipment on the East-West Line, according toThe service disruption started on Wednesday, with transport authorities determining a day later that a faulty train that was returning to Ulu Pandan depot had causedEngineers found 34 rail breaks as part of the damage along a 1.6km stretch of tracks between the two stations.

This fault - the first of its kind that has happened on an SMRT train - led to further damage, including to the third rail which supplies power, as well as power cables and rail clips.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

ChannelNewsAsia /  🏆 6. in SG

Train Disruption SMRT

Singapore Latest News, Singapore Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

NParks and OCBC launch Singapore's first seagrass restoration project; nearly S$1 million pledgedNParks and OCBC launch Singapore's first seagrass restoration project; nearly S$1 million pledgedSeagrass meadows, which can be found at East Coast Park or Changi Beach Park, can store carbon up to 40 times more effectively than forests on land.
Read more »

EWL train disruption: LTA, SMRT aiming for partial restoration of services on FridayEWL train disruption: LTA, SMRT aiming for partial restoration of services on FridayOn the second day of the East-West Line train disruption, the Land Transport Authority (LTA) and transport operator SMRT said that they are aiming for the partial restoration of train services by Friday (Sept 27).
Read more »

S’pore’s 1st seagrass restoration project aims to raise survival rate of carbon-storing plantS’pore’s 1st seagrass restoration project aims to raise survival rate of carbon-storing plantMore than 45 per cent of Singapore’s original seagrass cover has been lost over the last five decades.
Read more »

Singapore embarks on first seagrass restoration project; over 45% of meadows lost in five decadesSingapore embarks on first seagrass restoration project; over 45% of meadows lost in five decadesThe National Parks Board is partnering OCBC Bank on a pilot to restore and protect seagrass. These marine plants provide a critical food source and habitat for sea creatures. But more than 45% of seagrass meadows have disappeared from Singapore shores over the last five decades.
Read more »

Singapore Launches First Seagrass Restoration ProjectSingapore Launches First Seagrass Restoration ProjectSingapore is embarking on its first seagrass restoration project to revive these vital underwater ecosystems. Funded by OCBC Bank, the three-year research effort will focus on understanding seagrass reproduction and improving transplantation methods.
Read more »

Singapore Aims for Full East-West Line Service Restoration on MondaySingapore Aims for Full East-West Line Service Restoration on MondaySingapore's transport authorities plan to fully restore service on the East-West Line by Monday. They initially intended to operate a shuttle train between Jurong East and Buona Vista on one track, but this has been scrapped to expedite repairs.
Read more »



Render Time: 2025-04-19 13:57:58